Daily pre-task planning
Every crew starts the shift with a documented task plan covering the sequence, the lift, and the exposure.
Safety is the qualification. Our field program is what puts 7S crews on general-contractor prequalification lists.
Every crew starts the shift with a documented task plan covering the sequence, the lift, and the exposure.
Fall protection is enforced on every connection, deck, and joist-setting operation — no exceptions.
Picks are reviewed with the crane operator before the hook moves. Load path, ground conditions, and exclusion zones are set in advance.
Weekly toolbox talks in the field, plus review of any near-miss so the correction reaches every crew.
Each crew runs under an experienced foreman responsible for safety, sequence, and quality on that structure.
7S works inside the GC's site-specific safety plan and reports through the project's required systems.
We publish an EMR figure only when it is current and verifiable. Request our most recent loss-run and EMR letter with your prequalification package.